225.824 Echiche
On a hot July day, the crew got the existing children's bath and future master bath. They discover a flooring system that probably cna't support the heavy load of two bathrooms' worth of china and tile, and decide to beef it up before starting the rough plumbing. Up on the roof, mason Lenny Belleveau reflashes and repoints the chimneys, replacing a poorly built cricket and sealing it with a rubber membrane. Painting contractor Mike McManus powerwashes the building, and architecture students measure the building to prepare ""as-built"" drawings for the architects to use. Architect Pamela Hawkes visits the site and considers a suggestion of cutting through the house's rear ell with a porte cochere to gain access to the back yard and solve the parking problem.
Airbọchị Ikuku Mbụ : Jan 01, 1979
Airbọchị Ikuku Ikpeazụ : May 30, 2024
Ihe omume : 1162 Ihe omume
Oge : 46 Oge
Oge ojiri gaa: 30:60 Nkeji
.Lọ nka: PBS
Nkedo:
Ndị ọrụ: