225.824 Echiche
As construction nears an end, the yard gets planted. Inside, a custom home office is built from off-the-shelf materials. The old floors are reused on the second floor. An EV charger is installed, and the front door gets a high-sheen finish.
Airbọchị Ikuku Mbụ : Jan 01, 1979
Airbọchị Ikuku Ikpeazụ : May 30, 2024
Ihe omume : 1162 Ihe omume
Oge : 46 Oge
Oge ojiri gaa: 30:60 Nkeji
.Lọ nka: PBS
Nkedo:
Ndị ọrụ: