225.824 Echiche
The fully framed front of the house is revealed; work continues on the geothermal system; the connection to the interior is made; blocking is installed in the framing; replacing and rewiring old receptacles.
Airbọchị Ikuku Mbụ : Jan 01, 1979
Airbọchị Ikuku Ikpeazụ : May 30, 2024
Ihe omume : 1162 Ihe omume
Oge : 46 Oge
Oge ojiri gaa: 30:60 Nkeji
.Lọ nka: PBS
Nkedo:
Ndị ọrụ: