225.824 Echiche
Work continues on the new bedroom and bathroom, with Rob and Jennifer tackling the job of shingling, including the installation of flashing. Meanwhile, the rough plumbing work begins.
Airbọchị Ikuku Mbụ : Jan 01, 1979
Airbọchị Ikuku Ikpeazụ : May 30, 2024
Ihe omume : 1162 Ihe omume
Oge : 46 Oge
Oge ojiri gaa: 30:60 Nkeji
.Lọ nka: PBS
Nkedo:
Ndị ọrụ: